Home | Fixtures & Results | Player Profiles | Statistics | Picture Archive| Club Legends | Links | Changing room Chunter | OSCC Colts | Club News | The Ground | Club History
Pitch and Pavillion Maintainance
Considerable work needs to be done on the square and the Pavillion over the next six weeks in order to get the ground ready for Cricket.
The pitch itself requires a great deal of rolling (and now that the roller has been fixed there is no excuse left not to do it), then all sorts of other stuff before more rolling, cutting and rolling. Get in touch with the groundsman- Daryl - or skipper to offer a helping hand as he really does have his work cut out.
As you can see from the picture on the front page a sign has been fitted on the roof, there is plenty of work required within the pavillion. We suffered another flood this winter, spo there is plenty of work to do.
The home team changing refitt is 90% complete, we still need to fix the outdoor net and the sightscreens so get in touch and offer help.
Time is running out !